The project started out with the extensive brass divider strips layout. The brass divider strips were part of the architects layout and help with crack control.
Once the cement terrazzo is placed and cured it is time for the grinding to begin. For this project we extensively utilized New Grind Rhino 350 and 500 grinders.
With 1/4″ of material ground off the placed terrazzo, many bug holes are exposed. A white polymer modified patching compound is utilized to fill in these voids and make the floor as smooth as a countertop.
Brass inlays were water jet cut to be placed around columns and glass details. The Victoria Stone Design crew is expected to get within 1/32″ of these details.