Before a new layer could be applied, layers of patch needed to be built up.
Extensive reconstruction of the concrete slab was under taken. Re bar and lathe was used in areas to re enforce the wood flooring and create tensile strength.
Form work for the fireplace and return for the stairs were put into place.
Once the fireplace was prepped and formed up, the area was ready for the thin section overlay.
A make shift gang plank gave the crew access to the other side where the fireplace needed to be poured.
The thin section over lay was polished and sealed and the rest of the reno could happen.